Saudi Aramco North Sewage Treatment Plant
The project included the following works.
- Removal of old HDPE Geomembrane Liner for recycling.
- Surface preparation of the pit.
- Installation of Geotextile as a first layer prior to installation of HDPE Geomembrane Lining.
- Installation and quality control testing of new HDPE Geomembrane Lining including backfilling of anchor trenches with concrete.
Location
Saudi Aramco North Sewage Treatment Plant, Dhahran
Date
September 18th to 25th, 2017
Materials Used
HDPE Geomembrane Lining, Single Side Texture, 1.5MM (60 MIL) Thickness
Area
20,000 SQM