Saudi Aramco North Sewage Treatment Plant

The project included the following works.

  • Removal of old HDPE Geomembrane Liner for recycling.
  • Surface preparation of the pit.
  • Installation of Geotextile as a first layer prior to installation of HDPE Geomembrane Lining.
  • Installation and quality control testing of new HDPE Geomembrane Lining including backfilling of anchor trenches with concrete.

Location

Saudi Aramco North Sewage Treatment Plant, Dhahran

Date

September 18th to 25th, 2017

Materials Used

HDPE Geomembrane Lining, Single Side Texture, 1.5MM (60 MIL) Thickness

Area

20,000 SQM