Home
About Us
Products & Services
Oil & Gas Services
HDPE Geomembrane Lining
Concrete Canvas
Liquid Rubber
Natural Plantation & Biodiversity Eco Park
Staff Training Center
Industrial Services
HSEQ
Our Projects
HDPE Geomembrane Lining Projects
Concrete Canvas Projects
Natural Plantation & Biodiversity Eco Park Projects
News & Events
Contact Us
Home
Ma’aden Aluminium Slope Protection
Ma’aden Aluminium Slope Protection
Slope Protection Ma’aden Aluminium
Location
Ras Al Khair, Saudi Arabia
Date
Febuary 24
th
, 2020
Materials Used
CC5
TM
Bulk Rolls
Area
23,700m
2
Project Walkthrough
1. Site Before Installation of CC (1)
2. Site Before Installation of CC (2)
2. Site Before Installation of CC (3)
2. Site Before Installation of CC (4)
2. Site Before Installation of CC (5)
2. Site Before Installation of CC (6)
3. Top Anchor Trenches
4. Anchor Trench at the Starting Point of the Slope
5. Laying of CC using Boom Truck (1)
5. Laying of CC using Boom Truck (2)
5. Laying of CC using Boom Truck (3)
5. Laying of CC using Boom Truck (4)
5. Laying of CC using Boom Truck (5)
5. Laying of CC using Boom Truck (6)
6. Laying of CC at the Curves
7. Jointing using Stainless Steel Screws (1)
7. Jointing using Stainless Steel Screws (2)
7. Jointing using Stainless Steel Screws (3)
7. Jointing using Stainless Steel Screws (4)
7. Jointing using Stainless Steel Screws (5)
8. Pegging inside the top anchor trench
9. Termination with Concrete Sleepers using Stainless Steel Strips and Bolts (1)
9. Termination with Concrete Sleepers using Stainless Steel Strips and Bolts (2)
9. Termination with Concrete Sleepers using Stainless Steel Strips and Bolts (3)
9. Termination with Concrete Sleepers using Stainless Steel Strips and Bolts (4)
9. Termination with Concrete Sleepers using Stainless Steel Strips and Bolts (5)
9. Termination with Concrete Sleepers using Stainless Steel Strips and Bolts (6)
10. Hydration (1)
10. Hydration (2)
10. Hydration (3)
10. Hydration (4)
10. Hydration (5)
11. Backfilling of Top Anchor Trench
12. Laying and Hydration in Parallel (1)
12. Laying and Hydration in Parallel (2)
12. Laying and Hydration in Parallel (3)
Completed Installation (9)
TOP