Saudi Aramco Hawiyah NGL

The project included the following works.

  • Removal of old HDPE Geomembrane Liner for recycling.
  • Surface preparation of the two pits.
  • Installation and quality control testing of new HDPE Geomembrane Lining including backfilling of anchor trenches.

Location

Saudi Aramco Hawiyah NGL

Date

January to February 2019

Materials Used

HDPE Geomembrane Lining,Double Smooth, 1.5MM (60 MIL) Thickness

Area

150,000 SQM