Haradh Pyrophoric Treatment Area
Haradh Pyrophoric Treatment Area
Haradh Pyrophoric Treatment Area
Location
Haradh Gas Plant (SAUDI ARAMCO)
Date
October 8
th
, 2016
Materials Used
CCH8
TM
Bulk Rolls
Area
800m
2
Project Walkthrough
1. Area Prior to Installation
2. 4 layers of Marl were added prior to a Third-party Soil Compaction test
3. Perimeter DykeBund prior to installation of CC HydroTM
4. An anchor trench being excavated around the perimeter
5. installation of a 300gsm Geotextile
6. Bulk Roll of CCH8TM Mounted on a spreader beam
7. Each layer of CC HydroTM was thermally welded to the next with a thermal welder
8. The site after hydration had taken place
9. Another 300gsm layer of Geotextile and 10 - 15cm of Marl was added
10. Compaction of Marl prior to interlock installation
11. Installation of interlock (100mm x 200mm x 80mm)
12. Installation of concrete barricades
13. The installation took place in around 24 hours over a course of 4 days by 5 installers
14. The complete installation