Haradh Gas Plant – Repair S-116
The project included the following works.
- Removal of existing sludge from the pit after mixing with sand.
- Removal of old HDPE Geomembrane Liner.
- Cleanup of the pit.
- Surface preparation of the pit which included backfilling, grading, leveling and compaction.
- Installation and quality control testing of new HDPE Geomembrane Lining.
Location
Saudi Aramco Haradh Gas Plant - Pit S-116
Date
July 8th to 30th, 2017
Materials Used
HDPE Geomembrane Lining, Double Smooth, 1.5MM (60 MIL) Thickness
Area
10,472 SQM