Haradh Gas Plant – Repair S-116

The project included the following works.

  • Removal of existing sludge from the pit after mixing with sand.
  • Removal of old HDPE Geomembrane Liner.
  • Cleanup of the pit.
  • Surface preparation of the pit which included backfilling, grading, leveling and compaction.
  • Installation and quality control testing of new HDPE Geomembrane Lining.

Location

Saudi Aramco Haradh Gas Plant - Pit S-116

Date

July 8th to 30th, 2017

Materials Used

HDPE Geomembrane Lining, Double Smooth, 1.5MM (60 MIL) Thickness

Area

10,472 SQM

Project Walkthrough