Home
About Us
Products & Services
Oil & Gas Services
HDPE Geomembrane Lining
Concrete Canvas
Liquid Rubber
Natural Plantation & Biodiversity Eco Park
Staff Training Center
Industrial Services
HSEQ
Our Projects
HDPE Geomembrane Lining Projects
Concrete Canvas Projects
Natural Plantation & Biodiversity Eco Park Projects
News & Events
Contact Us
Home
Concrete Canvas Slope Protection Buraydah, Al-Qassim
Concrete Canvas Slope Protection Buraydah, Al-Qassim
Concrete Canvas Slope Protection Buraydah, Al-Qassim
Location
Buraydah, Al-Qassim, KSA
Date
June 3
rd
, 2017
Materials Used
CC8™ Bulk Rolls
Area
225 SQM
Project Walkthrough
1. Original Condition
2. Initial Site Preparation
3. After Initial Site Preparation
4. Compaction
5. Ensuring a Smooth Surface for Application of CC
6. Final Surface Ready for Application of CC
7. Drilling Holes in Adjoining Concrete Structures for CC8
8. Cutting CC8 into Appropriate Lengths
9. Preparing Top Anchor Trench for CC8
10. Preparing Bottom Anchor Trench for CC8
11. Unrolling CC8 Over the Slope
12. Ensuring Proper Overlaps
13. Fixing CC8 to Adjoining Concrete Structure With Bolts
14. Jointing CC8 With Hot Air Gun and Roller
15. Jointing With Screws After Jointing With Hot Air Gun
16. Anchoring On Sides With Pegs, Bolts and Adhesive
17. Backfilling Anchor Trenches With Concrete
18. Backfilling Side Anchor Trenches With Concrete
19. Hydration
20. Back Jointing Top Layer of CC8 With Screws
21 After Completion
TOP